Define Demolition and Earthwork Strategy

0:50
7:07
34.6K views

At 0:50 in

How to do Landscaping/Demolition Meeting with a Potential Customer

What happens here

Once the high-level project goals are understood, develop a strategy that seamlessly connects the demolition process with the future requirements for the new construction. This involves planning how grading and material removal during demolition can efficiently set up the site for new grades and layouts, particularly for features like a tuck-under garage. Emphasize how a knowledgeable contractor's ability to establish initial grades while demolishing the old structure, removing driveways, and cutting down existing hills can significantly reduce subsequent excavation costs and time for the new build.

Goal: Develop a cohesive plan that links demolition activities with new construction site preparation to optimize efficiency and cost.

Tools and materials

  • GPS/Survey Equipment — Precise elevation mapping and grade setting during earthwork
  • Site Plan/Blueprint — Understanding target elevations and structure placement for the new house

What they say

Hide

okay okay perfect so but what that'll help me understand too is if we got an overall concept that we're gonna be rolling with this thing I can help you establish grades as we're demoing removing the house we're taking out driveways and getting this this hill cut down I've done this for over 20 years so there's a lot a lot of little things that I can come into the equation with you on and go hey Dario let's do this or let's do that and that'll help you save money down the road so let's go in and