After all the preparation, it's time to mix and apply the epoxy. The creator uses a two-part industrial epoxy called Tile-Clad High Solids. He emphasizes following the manufacturer's instructions for mixing Part A (color) and Part B (hardener) and allowing it to 'sweat' (activate) for the recommended time, which is 30 minutes for this product. For the first coat of epoxy, he recommends thinning the mixture with two pints of Reducer 54 to allow better absorption into the concrete. He uses a drill with a paint mixer attachment to thoroughly mix the epoxy. When applying, he uses a 9-inch roller with a 1/4-inch mohair nap for the main floor and a 4-inch roller with a 3/8-inch nap for cutting in around edges and details. He advises using plenty of pressure when rolling the first coat to push the epoxy down into the concrete's pores for good adhesion. He suggests having one person handle the cut-ins and another rolling the main floor to work efficiently. Using disposable gloves is recommended, as epoxy is sticky and difficult to clean off skin.
Goal: Apply the initial layer of epoxy to the prepared concrete floor
Tools and materials
- 4-inch Roller with 3/8-inch Nap — Applying epoxy for cut-ins and detailed areas
- 5-Gallon Bucket — Mixing and holding epoxy
- 9-inch Roller with 1/4-inch Mohair Nap — Applying epoxy to the main floor areas
- Drill DeWalt — Mixing the epoxy components
- Extension Pole — Extending the reach of the roller for floor application
- Measuring Cup — Measuring the reducer
- Paint Mixer Attachment — Attaching to the drill for thorough epoxy mixing
- Rubber Gloves — Protecting hands from epoxy
- Reducer 54 — Thinning the first coat of epoxy
- Tile-Clad High Solids Epoxy — The color component of the epoxy