Site Preparation and Excavation

0:30
15:19
554.2K views

At 0:30 in

How to Build a simple Ground level Deck in a weekend

What happens here

The video begins with an introduction to the ground-level deck project. The first crucial step is to prepare the site by excavating the ground. This involves digging down to create a sufficient air gap underneath the future deck structure, which is essential to prevent moisture buildup and rot in the lumber. The presenter shows the excavated area and mentions the large quantity of soil removed, emphasizing the depth required to achieve the correct elevation relative to the existing house structure.

Goal: Prepare the ground for the deck structure and ensure proper air circulation.

Tools and materials

  • Cinder Blocks — Temporary elevation markers
  • Rakes — Leveling and smoothing the excavated ground
  • Shovels — Excavating and moving soil
  • Tape Measure — Measuring the depth of the excavation to ensure proper elevation
  • Treated Lumber — Temporary elevation markers
  • Wheelbarrow — Transporting excavated soil away from the work area

What they say

Hide

Shut up. Good morning, guys. Well, it's a brand new day and we're starting a brand new project. We're actually going to be installing a ground level deck. Now, this deck actually might be a little bit more than ground level. In fact, we had to do a lot of digging to get below the bottom of this deck so we could get the right elevation set. So, we're going to show you exactly how we do this project and take you along for the ride. What lumber we use, what materials we use, what tools we use, and how we build it coming up next. So, what are we waiting for? Let's build a ground level deck. When we're building a ground level deck is we want to get air below the deck. We don't want the deck to actually sit and be suffocated by the air underneath it. So, we've got to establish an elevation. Now, this is our deck elevation right here. This board is setting everything up. You can see how much we dug below it so that we could get just that a little bit of breathing room established for the deck. All right, Frank, you got to you got to tell me about your markings. That's how many wheelbarrow loads I took out of here. 5 10 15 20 25 30 35 40 45 50 55. So I took out about 60 65 loads out of here. And I'm talking big wheelbarl. That That'd be a small load right there. And the worst part, I just got done buying three electric wheelbarls. You don't bring me one. If I would have known, there would have been two up here and I would have been here with you. Frankie, you want to walk