Construct the Drainage Zone Behind the Wall
At 3:18 in
How to Build a Retaining Wall
What happens here
Behind the retaining wall, create a robust drainage zone. The minimum recommended depth for this zone is 12 inches, but the presenter suggests extending it to 18-24 inches for enhanced protection. This zone should be filled with the exact same material used for the base aggregate: 3/4 inch free-draining angular rock. This allows any water accumulating behind the wall to percolate through the rock and drain away, preventing hydrostatic pressure from building up. Hydrostatic pressure is a common cause of retaining wall failure, so this step acts as crucial 'cheap insurance' for the wall's longevity.
Goal: Prevent hydrostatic pressure by installing adequate drainage behind the wall
Tools and materials
- Shovel — Backfilling the drainage zone
- 3/4 inch Free-Draining Angular Rock — Creating the drainage layer behind the wall
What they say
(793 characters)Hide
What they say
(793 characters)Auto-generated from the video audio.