Prepare Site and Install Floating Deck Base
1:30
17:52
64.2K views
At 1:30 in
How To Build a DIY Hanging Daybed Swing on a Floating Deck - EPIC BACKYARD CHILL SPOT!
What happens here
Prepare the area by rough grading and then precisely leveling the ground where the floating deck will sit. Use screed pipes and a level to ensure a perfectly flat surface. Spread a 3/4 inch layer of clean stone over the leveled area using a mini skid steer and rakes/shovels. Compact the stone thoroughly with a plate compactor to create a solid, stable foundation for the deck frame.
Goal: Create a level and compacted stone base for the floating deck.
Tools and materials
- Level — Checking the flatness of the ground and stone
- Mini Skid Steer Toro Dingo TX-1000 — Moving and spreading the clean stone
- Plate Compactor — Compacting the stone base for stability
- Rake — Spreading and evening out stone
- Screed Pipes — Guiding the leveling of the stone base
- Shovel — Spreading and moving stone
- 3/4 inch Clean Stone — Creating the compacted base for the deck
What they say
(728 characters)Hide
What they say
(728 characters)Auto-generated from the video audio.