Apply Profit and Overhead

2:18
4:25
15.3K views

At 2:18 in

How to Bid CONCRETE Edging

What happens here

To ensure profitability, add a percentage for profit and overhead to the total base cost. The presenter suggests adding 10% for this. For a base cost of $6.58, adding 10% (approximately $0.67) brings the technical cost to $7.25 per linear foot (original video calculation results in $7.25 not $7.42; there is a discrepancy in the audio vs. onscreen text in the video). The presenter then rounds this up for simplicity to $7.50 per linear foot.

Goal: Incorporate profit margins and overhead into the final bid price.

Tools and materials

  • Calculator — Calculating profit and overhead percentages

What they say

Hide

material cost we add that up it comes a $6.75 per linear foot add 10% profit and overhead that gives you another 67 on top of that and technically it comes out to $742 per linear Fe foot we're going to round this up because we want simple numbers simple options for our customers so $77.50 per linear foot but be careful one thing with those concrete edges you

Auto-generated from the video audio.