Skip to main content

Install Metal Siding Panels

0:48
17:24
46.7K views

At 0:48 in

How NOT to install Metal Siding- PRO tips & Everything you need to know from start to finish pt1 4k

What happens here

Each metal siding panel is measured to the correct height, taking into account the J-channel at the top and the bottom closure strip. The panels are then cut using appropriate metal cutting tools. Installation begins by carefully positioning the first panel, ensuring it is plumb and aligned. The overlap side of each panel (the side designed to fit over the previous panel's larger ridge) is snugly fitted into the J-channel or over the preceding panel. Color-matched screws with sealing washers are then driven through the metal panel and into the horizontal backer boards, creating a watertight seal. This process is repeated for each panel, working across the wall, ensuring tight joins and a consistent, level installation.

Goal: Cover the building walls with new metal siding, ensuring a secure and weather-tight installation

What they say

Hide

[Applause] all right so what are we looking at Frankie well I would yeah so obviously we can't screw to this okay so I kept this up underneath so when you say obviously I just want to point out why you say obviously Frank there's nothing with ever felt because if you were putting on siding if we were going long ways then we skew into the studs we're standing our tent up right so we're not gonna be into the studs every time okay so we're doing something a little different you guys so we're actually going straight up and down with our tin but let's explain to them why we're doing there Frankie Kizza maybe because there may be used to seeing siding going sideways yeah well like this the siding was going sideways too but if you run your tent sideways with the humps in it the humps always get dirty they'll always be dirt on you know and it catches little bits of water and it's just kind of nasty yeah running metal siding straight up and down and if you look at most big buildings there's stuff like that that's way they usually run yeah just because building a stick building they will run a long way deciding but it's it's your preference of what you want how you want so it can be run either way we're just explaining why we're doing what we're doing and letting you guys do whatever you guys want to do now you guys when you pull your siding off you may find built right on your buildings don't panic you don't have to go out and replace all of it with plywood there's a reason why you can use this I don't like it I don't like it I wouldn't put it up so if like we were gonna end up redoing it or if any of these sheets we're in good shape it would be plywood yep it would be we'd never touch this stuff right so what's next Frankie then with it once I got this poor off I left this underneath because it's behind stop it already so I'll screw this tight study that I did down here I screwed it off okay okay then every two feet I'm gonna run another boy masonite board across so I'll scream itin off at every two feet so I'm gonna use this masonite siding either nailer okay so you're gonna reuse some of the siding just to help set your lines up yep once I put them back on here I'm gonna wrap it with house wrap pulse wrap because of the 10 creating condensation behind it I don't want that felt board to get wet so that's a that's a great point so Frankie you just kind of glossed over the 10 creating condensation but hot cold think of like a glass of cold water right and it'll…

Auto-generated from the video audio.