Address Vertical Failure and Bedding Sand
At 3:37 in
How NOT to Build with Pavers- Why They FAIL! *DIY your own successful paver project
What happens here
Vertical failure is described as individual pavers lifting or sinking unevenly. The presenter explains that this often occurs due to excessive bedding sand (more than 1 inch) or the wrong type of bedding sand, which lacks cohesive material. When pressure is applied, such as from a chair leg, the sand shifts, causing the paver to tilt. The recommended bedding sand depth is 3/4 inch, with a maximum of 1 inch. To achieve this, a 3/4-inch plastic PVC pipe or galvanized/steel pipe can be used as a screed guide.
Goal: This step details vertical failure (individual pavers popping up) and explains how using the wrong amount or type of bedding sand contributes to it, providing guidelines for proper bedding sand depth.
Tools and materials
- Galvanized or Steel Pipe
- PVC Pipe (3/4 inch)
- Bedding Sand N/A
What they say
(2,382 characters)Hide
What they say
(2,382 characters)Auto-generated from the video audio.