Mass Excavation and Rough Grading
1:48
30:00
17.9K views
At 1:48 in
How NOT to build a retaining wall
What happens here
The crew begins the process of moving large amounts of earth using a skid steer and mini-excavator. This involves cutting into the existing slope to create terraced areas. Large piles of 'black dirt' (topsoil) are delivered by dump truck and spread across the new terraces. This phase transforms the steep slope into more manageable, leveled sections, setting the stage for retaining wall construction and planting.
Goal: Transform the steep slope into terraced sections and prepare for walls.
Tools and materials
- Dump Truck Unspecified — Delivering large quantities of fill material
- Mini-Excavator Bobcat 331 — Precise digging and material handling in tighter spaces
- Rake Unspecified — Spreading and leveling soil
- Shovel Unspecified — Manual excavation and spreading of dirt
- Skid Steer Loader ASV — Moving large volumes of earth and grading
- Wheelbarrow Jackson — Manually moving dirt and materials in smaller quantities
- Black Dirt — Building up new levels and providing fertile soil for planting
- Silt Fence Unspecified — Erosion control on slopes
What they say