What happens here
With the house largely reduced to rubble, the excavator turns its attention to the remaining brick chimney, efficiently bringing it down into the growing pile of debris. The demolition continues even through a rain shower, which the operator humorously notes as "natural dust control." Once the main structure is down, the excavator begins the process of loading the large volume of debris into a waiting Peterbilt dump truck for removal. A backhoe is then used to perform final site cleanup, pushing smaller debris piles and smoothing the ground.
Goal: Remove remaining structures, load debris, and clear the demolition site.
Tools and materials
- CASE 310E Backhoe CASE — Final site cleanup and leveling
- Kobelco Excavator Kobelco — Demolishing the chimney and loading debris
- Peterbilt Dump Truck Peterbilt — Transporting demolition debris away from the site
- Demolition Debris N/A — Waste material from the demolished house