Review Installed Channel Drain Pipe Layout
At 0:00 in
Greatest drain test of all time or.......??
What happens here
This initial step involves observing the prepared site, starting with an aerial perspective that visually traces the intended drainage route via a red line, emphasizing how water will be directed away from the patio. The video then shifts to ground level, revealing the actual white PVC drain pipes meticulously placed within trenches alongside the building. These pipes represent the core of the channel drainage system, designed to carry water collected from surface grates (like linear grates) away from vulnerable patio and building foundations. The purpose of this step is to confirm the pipe network is physically in place as planned.
Goal: Conduct a visual inspection of the laid out PVC pipes for the channel drain system, ensuring the path is correctly established around the patio area.
Tools and materials
- Excavated Trench
- PVC Drain Pipes
What they say
(100 characters)Hide
What they say
(100 characters)Auto-generated from the video audio.