Inspect Prepared Site for Concrete Pour

0:00
0:31
2.4K views

At 0:00 in

Going to stop us from tracking dirt and stone into the shop! 

What happens here

The video begins by showcasing the site for the concrete apron, which has already been excavated and prepared. This initial phase would involve clearing debris, excavating the ground to the required depth, establishing a stable sub-base through grading and compaction, and installing formwork to define the perimeter and thickness of the concrete slab. The speaker notes that this is for the 'second half' of their front bay door apron, implying previous work and careful planning for proper expansion joints between pours. The purpose of the apron, for washing trucks and keeping the shop clean, is also highlighted.

Goal: Ensure site is ready for concrete delivery