Initial Excavation and Site Shaping
At 0:56 in
Giant Pond, Waterfall, Stream & Bridge-in just 12 hours ?!? It can be done.
What happens here
A large team of workers is seen manually excavating the area for the pond and water feature. Dirt is being moved from the dig site using shovels and wheelbarrows to create berms for the waterfall, following a 'cut and fill' method where no material is exported off-site. The goal is to create a balanced site where all excavated material is reused on-site. The scale of the project is noted, with approximately 15 tons of boulders and 2-3 tons of river rock to be incorporated, all moved without heavy equipment.
Goal: Excavate the pond area and use displaced soil to create berms for the waterfall, ensuring no material leaves the site.
Tools and materials
- Boulders — Creating vertical elements of the pond and waterfall structure
- River Rock — Covering horizontal surfaces and integrating into the design
- Shovels — Digging and moving soil
- Wheelbarrows Jackson — Transporting excavated soil and rocks
What they say
(479 characters)Hide
What they say
(479 characters)Auto-generated from the video audio.