Deck Framing and Initial Post Installation
1:38
17:35
94.7K views
At 1:38 in
Front Yard Transformation Time Lapse - BEAUTIFUL Before And After!
What happens here
After the concrete foundations are poured and cured, the next step involves constructing the deck framing. This includes setting the main support posts, attaching ledgers to the house, and building the joist system. The timber is pressure-treated lumber, visible by its green tint. This stage builds the horizontal base for the deck and the vertical supports for the future porch roof. A Kubota skid-steer loader is also seen moving lumber around the site.
Goal: Construct the structural frame for the deck and install initial support posts for the porch roof.
Tools and materials
- Circular Saw — Cutting lumber to size
- Kubota Skid-Steer Loader Kubota — Moving heavy lumber and materials around the site
- Power Drill — Drilling pilot holes and driving screws
- Pressure-Treated Lumber — Constructing the deck frame and support posts
- Wood Screws — Securing lumber components