Install Retaining Wall Base Course with "Step Up" Method
At 12:28 in
Fighting Rain out on the job
What happens here
Prepare the base course for the new retaining wall, adjusting for the natural slope of the ground. Instead of burying additional blocks to maintain a consistent level, use a "step up" method where the base course steps up with the elevation changes. This ensures that the base remains consistently supported at the appropriate depth relative to the rising ground level, preventing unnecessary burial of blocks and maintaining structural integrity. Use a plate compactor to compact the base material (gravel) beneath the blocks to create a stable foundation.
Goal: Lay a stable and correctly leveled base course for the new retaining wall, adapting to ground elevation changes.
Tools and materials
- Gravel — Used as the base material for compaction beneath the blocks
- Level — Ensuring each course of blocks is perfectly level
- Plate Compactor Honda — Compacting the gravel base to create a solid foundation
- Retaining Wall Blocks Versa-Lok — Creating the base course of the retaining wall
What they say
(1,026 characters)Hide
What they say
(1,026 characters)Auto-generated from the video audio.