Dump and Spread Gravel for Backfill
9:30
15:20
55.3K views
At 9:30 in
Fighting Rain out on the job
What happens here
Alex and Blaine meticulously position a black Sure-Trac dump trailer, full of gravel, near the retaining wall area. Blaine operates the hydraulic lift system of the trailer, raising the bed to allow the gravel to flow out and form a pile on the ground. This gravel will be used as backfill material for the retaining wall. Alex ensures clearance from overhead powerlines during the dumping process.
Goal: Position a dump trailer filled with gravel and use its hydraulic lift mechanism to discharge the backfill material onto the ground at the job site.
Tools and materials
- Pickup Truck
- Sure-Trac Dump Trailer
- Gravel (approx. 8
- 600 lbs)
What they say
(219 characters)Hide
What they say
(219 characters)Auto-generated from the video audio.