Skip to main content

Site Layout and Initial Trenching

9:23
19:55
8.1K views

At 9:23 in

Fake Construction Gurus Exposed.

What happens here

Upon arriving at the job site, Sammy outlines the plan for the day, which involves creating a swale, installing multiple drain boxes, and laying drain tile. He indicates the approximate path of the swale, marking where it will extend to. The initial trenching process is shown, preparing the ground for the drainage system components.

Goal: Prepare the ground for swale creation and drainage component installation.

Tools and materials

  • Mini Excavator Bobcat — Digging trenches and shaping the landscape
  • Pink Flags — Marking the path of the swale and drainage system
  • Shovel — Manual digging and shaping of trenches

What they say

Hide

and that's developing your company. Good morning everybody. Uh so today uh we're going to cut in a little bit more of a swale here. We're probably going to Yeah, about where that we're going to kick her out to about where that flag is there and have that be the outside of the swale. and uh got plastic and rock going in and all sorts of stuff. So, let's go get that miniacs popped off and they're scraping this sculpting her out a little bit, guys. Oh, there's a whole bunch of redwing blackbirds over there. There's a pond back there. And I've been having a very, very good time watching all the birds coming in and out. They got a pretty decent amount of wildlife up here. I'm tired. I'll stop rambling. Let's go.

Auto-generated from the video audio.