Complete Grading and Install Boulder Walls
At 19:00 in
Fake Construction Gurus Exposed.
What happens here
The final stage involves refining the ground contours and securing the drainage system. The crew backfills the trenches, carefully grading the soil around the house foundation to direct surface water away from the structure. Special attention is paid to areas like the air conditioning unit, which previously sat too low. A new swale is created or enhanced to guide water effectively. Additionally, small boulder wing walls are constructed in specific locations. These walls serve a dual purpose: they help retain the newly established grade and act as a visual and functional barrier to further ensure proper water diversion away from the house. The entire work area is then covered with tarps for protection over the weekend.
Goal: Trenches are backfilled, the surrounding terrain is graded for optimal water flow, and decorative boulder wing walls are built to support the new landscape and direct water.
Tools and materials
- Boulders
- Rakes
- Shovels
- Tarps
What they say
(528 characters)Hide
What they say
(528 characters)Auto-generated from the video audio.