What happens here

The project begins with the existing room being stripped down. Old drywall is torn out to expose the wall studs. Any existing or new insulation (like fiberglass batts) is installed or replaced behind the areas where the rock panels will be placed, ensuring proper thermal and sound insulation for the new cave-like environment.

Goal: Strip the room to its studs and prepare for rock panel installation with insulation.

Tools and materials

  • Drywall — Removal of existing wall covering
  • Gloves — Protecting hands during demolition and insulation handling
  • Hammer — Removing drywall
  • Insulation — Thermal and sound insulation behind the rock panels
  • Safety Glasses — Eye protection during demolition
  • Utility Knife — Cutting insulation