Skip to main content

Site Preparation and Base Installation

0:00
0:36
1K views

At 0:00 in

“eatin sum lunch”

What happens here

The site for the new patio has been fully excavated and prepared. This involves digging out the existing ground to the required depth and then installing a compacted base layer, typically of crushed stone or gravel. The speaker mentions that the area has been "dug everything out" and "based everything," which are critical initial steps for ensuring a stable foundation for the patio.

Goal: Prepare the ground and install a stable base for the patio

Tools and materials

  • Excavator/Skid Steer Creekside — Digging and moving large quantities of earth
  • Landscape Fabric — Separating the sub-base from the native soil to prevent mixing and promote drainage
  • Plate Compactor — Compacting the base material to create a solid foundation
  • Crushed Stone/Gravel — Creating the compacted sub-base and base layers for the patio