Run Cold Water PEX Lines
0:00
1:01
5.9K views
At 0:00 in
Diz Plumbing #firstshort#plumber#tutorial#fyp#blowup#goviral#bluecollar
What happens here
The project begins in a framed residential structure where the main PVC drain/vent lines are already installed. The plumber starts by running lengths of blue PEX tubing, intended for cold water supply, through pre-drilled holes in the wooden wall studs. This establishes the initial horizontal and vertical pathways for the cold water lines to various fixtures.
Goal: Establish the main cold water supply routes
Tools and materials
- Blue PEX Tubing — Cold water supply lines
- Wall Studs — The structural framing through which PEX is routed