Mix Fast-Setting Cement Patch

3:06
6:23
548K views

At 3:06 in

DIY Driveway for $660 - Concrete repair Part #1 - Cement repair, resurface and renovation

What happens here

Tools and materials

  • 5-Gallon Pail
  • Dedicated Mud Mixer Milwaukee
  • Measuring Cup
  • Water N/A

What they say

Hide

this material. I have water in there first when I dump the bag, and then I'll add the other. So, a three 40 lb bag takes three quarts. And we're measuring precise. You add the water first. Two quarts. This product gets mixed in small batches. A cement mixer is not recommended. All you need is a plastic pail and a hand mixer. The water always goes in first cuz if you put the cement in first and then try to add the water, what happens, Frankie? It balls up and you'll never get the bottom. Will always stay dry. I guess you don't want dry balls. So Frankie adds a 40 lb bag to three quarts of water in a 5gallon pail. And he uses actually a dedicated mud mixer. That's not a cordless drill. That gives him more control. It's designed specifically for this application. After the material is thoroughly mixed together, you have about 5 minutes of working time. Frankie's working fast cuz we got five minutes.

Auto-generated from the video audio.