Skip to main content

Prepare Patio Base

0:27
0:35
2.7K views

At 0:27 in

DEF was time for an upgrade. #hardscape #retainingwall

What happens here

After the retaining walls are complete, prepare the patio base. This involves laying down and compacting a base layer of crushed aggregate (like limestone or gravel). Then, install geotextile fabric to prevent weed growth and separate the base from the bedding layer. Finally, spread and screed a layer of bedding sand to a precise, consistent thickness to create a perfectly level surface for the pavers. The video briefly shows a dark fabric and white pipes which are likely part of the base preparation and drainage for the patio area.

Goal: Create a stable and level base for paver installation.

Tools and materials

  • Compactor/Plate Tamper — Compacting the aggregate base
  • Level — Checking the levelness of the base and sand
  • Rubber Mallet — Fine adjustments during screeding
  • Screed Boards/Pipes — Creating a level and consistent sand bedding layer
  • Bedding Sand — Creating a precise and level surface for paver placement
  • Crushed Aggregate Base — Creating the primary structural layer of the patio
  • Geotextile Fabric — Weed barrier and base stabilization