Install Second Wall Panel (Door Side Bottom)
0:03
0:29
34.3K views
At 0:03 in
Day 6 Shed build π trick shot at the end π #framing #tools #carpentry #construction
What happens here
After securing the first panel, bring another OSB panel and carefully position it adjacent to the first, ensuring it aligns with the shed's wall framing. In this segment, a gap is left for what appears to be a door or window opening. Once the panel is correctly aligned and butt-joined with the previous panel, use the cordless nail gun to securely fasten it to the underlying studs, top plate, and bottom plate.
Goal: Continue covering the wall, accounting for openings.
Tools and materials
- Cordless Nail Gun Milwaukee M18 Fuel β Fastening OSB panels to the shed framing
- Framing Nails β Securing the OSB panels
- OSB Panels β Sheathing the exterior walls of the shed