Skip to main content

Install Paver Base and Main Patio Field

0:05
0:39
2.4K views

At 0:05 in

crack-crete 🤣

What happens here

After preparing the sub-base, install a compacted granular base, typically 6-8 inches of crushed stone. This provides a stable and permeable foundation. On top of the base, spread a 1-inch layer of bedding sand, screeding it level to ensure a smooth surface for the pavers. The video shows the main patio area being laid with 'Beacon Hill' pavers in a 45-degree angle pattern, a popular choice for its aesthetic appeal and interlocking properties.

Goal: Lay the foundation and main field of the paver patio.

Tools and materials

  • Paver Cutter/Saw — Cutting pavers to size and specific angles
  • Plate Compactor — Compacting the granular base and pavers
  • Rubber Mallet — Gently tapping pavers into place
  • Screed Boards — Leveling the bedding sand
  • Beacon Hill Pavers Techo-Bloc — Main field of the patio
  • Bedding Sand — Providing a level surface for paver installation
  • Crushed Stone — Creating a stable sub-base for the pavers