Prepare and Pour Concrete Footings

0:00
0:58
26.1K views

At 0:00 in

CORNER STAIR FRAMING 101: class is in session 📝

What happens here

The initial part of the video briefly shows the preparation phase for the deck structure, which includes mixing concrete. Water is first added to a wheelbarrow, followed by dry concrete mix, and then thoroughly combined using a shovel. Subsequently, this concrete is poured into trenches where rebar has been laid for reinforcement. This step implies the creation of footings or a foundation necessary to support the deck and its stairs.

Goal: Lay the concrete foundation for the deck and stairs.

Tools and materials

  • Bucket Harbor Freight — For carrying water to the mix
  • Lumber — To create forms for the concrete trenches (implied)
  • Rebar — For reinforcing concrete footings
  • Shovel — For mixing concrete
  • Wheelbarrow — For mixing and transporting concrete
  • Dry Concrete Mix — The main material for the footings
  • Water — To mix with the dry concrete