Skip to main content

On-the-Spot Ballpark Cost Estimation

4:22
11:18
49.9K views

At 4:22 in

Construction Management and Estimating

What happens here

Leverage accumulated professional experience to quickly assess the scale of the project. For instance, based on previous jobs involving similar hillside transformations and retaining wall construction (such as one that required removing 600 cubic yards of soil and installing 600 square feet of wall for $34,000), provide a ballpark figure for the current project. In this case, the project involves approximately 130 linear feet of terraced wall, about 9 feet tall including embedment, totaling 1,170 square feet of retaining wall surface and requiring at least 600 cubic yards of excavation. The on-the-spot estimate provided was $65,120. This initial figure serves to gauge the customer's budget expectations and overall seriousness.

Goal: Based on extensive prior experience with similar projects, provide a quick, high-level cost estimate for the requested site preparation work, even without detailed calculations.

Tools and materials

  • Professional Experience

What they say

Hide

house. Now, I've done this job before. I've done this job many times. In fact, I have a video called How to Turn a Hill into a Flat Backyard. And that is it lays it all out um in that on that job. So now what I'm doing right now is instead of recalculating everything and reme-measuring everything, I'm going on past experience. And this is where you guys as you grow in your business, you're going to be able to do the exact same thing on this site. Let me back up so you guys can get a view of it in comparison. Now, we're going to compare and contrast that video where it says how to turn a hill into a flat backyard. We had 600 cubic yards of soil we removed. It looked almost identical to this. And then we ended up installing I don't remember how many square feet but I think it was 75 tons which 75 times 7 somewhere. Let me think about this for a second. You know on that job how to turn a hill into a flat backyard. I can reme I can't remember how many square feet we installed but I can remember how many tons of boulders. In this case it was about 87 tons of boulders. Now, if I'm going to do the math bass backwards, 87 tons at we get seven square foot per ton using a 2 to threeft boulder. Uh, so that's going to give us right around 600 to 625 square ft. Depends on how, you know, how many square feet per boulder we're getting. So, on that job, we hauled out 600 cubic yards of material and installed 600 square feet of wall. That job was $34,000 for that project. So, I know that's going to be our base. I really I know that's where we're going to be our base where we're going to start from, but then I'm going to start designing backwards on this one to uh find out what they need, where the house is going to be positioned as well because this this one is coming down and then the new one's going in. Um, and so we've got to get that figured out. Now, the homeowner is looking at me like, why is there a person outside my window? I've never I didn't knock on the door. I didn't know anybody was home. So, good enough. I better go talk to him, huh? Okay. It doesn't relate to the So, homeowner Dan builder, Eric. And what we're looking at is uh 130 linear foot retaining wall, 7 foot tall, excavating out at least 600 cubic yards of soil. He asked me for a quick number, something that he could budgetwise, and we came up

Auto-generated from the video audio.