Skip to main content

Prepare the Sub-base

0:14
4:54
1.2M views

At 0:14 in

Concrete basics for Beginners from top to bottom, ground prep, rebar, sealing & protecting

What happens here

The initial step involves ensuring the ground is properly prepared by removing any soft, questionable, or organic material that could compromise the concrete's stability. This material is then replaced with structural fill soil, such as Class 5 gravel (also known as 57 stone or 3/4 inch rock with binding material), which is ideal due to its excellent drainage properties and stability through freeze-thaw cycles. This prevents the ground from flexing and transferring movement to the concrete above.

Tools and materials

  • Backhoe
  • Skid-Steer Loader

What they say

Hide

subscribe. Step and one of the most important steps before you begin pouring any concrete is to make sure that your ground is ready. Any soft, questionable, or organic material needs to be removed. This then gets replaced with structural fill soil. But let me show you exactly what I mean when we talk about the base material. I want to show you guys something here. This is known as class 5. In your area, it may be known as 57 stone or something else. But this is basically has 3/4 in rock with just enough reraining binding material in it. This was just rained on recently. And you can tell this material is not hyper saturated. It's not holding water. And the important fact is that when this goes through a freeze thaw cycle and the ground starts to flex, it's not going to transmit that to the concrete. That means that your concrete is going to last that much longer if it's got a stable, non-moving soil beneath it. Once

Auto-generated from the video audio.