Prepare Base Layer and Level Surface
0:00
1:00
6.6K views
At 0:00 in
Challenging and fun from the render to the build!! #patioconstruction
What happens here
The initial phase of the custom patio installation involves preparing the ground. This typically includes excavating the area to the required depth, laying down a robust base layer of crushed stone or gravel, and then using screed bars to meticulously level and smooth the surface. This compacted base ensures proper drainage and a stable foundation for the pavers.
Goal: Create a stable, level, and well-drained foundation for the patio
Tools and materials
- Plate Compactor — Compacting the gravel base for stability
- Rake — Spreading and leveling gravel
- Screed Bars — Creating a perfectly flat and level surface for the sand setting bed
- Shovel — Excavating the area and spreading gravel
- Spirit Level — Checking the slope and levelness of the base
- Bedding Sand — A thin layer spread over the compacted base before laying pavers, allowing for fine adjustments
- Crushed Stone / Gravel — Creating the base layer of the patio