Skip to main content

Prepare Base Layer and Level Surface

0:00
1:00
6.6K views

At 0:00 in

Challenging and fun from the render to the build!! #patioconstruction

What happens here

The initial phase of the custom patio installation involves preparing the ground. This typically includes excavating the area to the required depth, laying down a robust base layer of crushed stone or gravel, and then using screed bars to meticulously level and smooth the surface. This compacted base ensures proper drainage and a stable foundation for the pavers.

Goal: Create a stable, level, and well-drained foundation for the patio

Tools and materials

  • Plate Compactor — Compacting the gravel base for stability
  • Rake — Spreading and leveling gravel
  • Screed Bars — Creating a perfectly flat and level surface for the sand setting bed
  • Shovel — Excavating the area and spreading gravel
  • Spirit Level — Checking the slope and levelness of the base
  • Bedding Sand — A thin layer spread over the compacted base before laying pavers, allowing for fine adjustments
  • Crushed Stone / Gravel — Creating the base layer of the patio