Costing Project Chunks and Final Bid Assembly
At 15:30 in
Building wall collapses
What happens here
The speaker then demonstrates the costing process for 'Chunk 1' (cleanup and debris removal) of the collapsed wall project. He presents a breakdown of costs: 76 hours of labor at $65 per hour ($4,940); 27 hours of excavator use at $250 per hour ($6,750); 11 hours of dump truck time at $175 per hour ($1,925); and three dump fees at $250 each ($750). The total for these direct costs for Chunk 1 is $14,365. He then instructs to add the calculated daily overhead (e.g., $1,953 per day x 3 days = $5,859) and the desired profit for those 3 days to arrive at the final bid for this specific chunk. This detailed costing approach is meant to eliminate guesswork and allow for accurate, competitive bidding across all project components.
Goal: Apply detailed job costing to individual project chunks and compile a comprehensive, profitable bid.
Tools and materials
- Calculator — Performing financial calculations for labor, equipment, and dump fees
What they say
(2,501 characters)Hide
What they say
(2,501 characters)Auto-generated from the video audio.