Costing Project Chunks and Final Bid Assembly

15:30
30:55
29.2K views

At 15:30 in

Building wall collapses

What happens here

The speaker then demonstrates the costing process for 'Chunk 1' (cleanup and debris removal) of the collapsed wall project. He presents a breakdown of costs: 76 hours of labor at $65 per hour ($4,940); 27 hours of excavator use at $250 per hour ($6,750); 11 hours of dump truck time at $175 per hour ($1,925); and three dump fees at $250 each ($750). The total for these direct costs for Chunk 1 is $14,365. He then instructs to add the calculated daily overhead (e.g., $1,953 per day x 3 days = $5,859) and the desired profit for those 3 days to arrive at the final bid for this specific chunk. This detailed costing approach is meant to eliminate guesswork and allow for accurate, competitive bidding across all project components.

Goal: Apply detailed job costing to individual project chunks and compile a comprehensive, profitable bid.

Tools and materials

  • Calculator — Performing financial calculations for labor, equipment, and dump fees

What they say

Hide

do I you want to take a chunk out of the middle kind of here I mean you could you could get down you could get her down in there and drag it this way the first time you do a project like this you're going to guess and then you're never going to guess again because of job costing if you get a job once you put a bid together if you get that project you need to job cost which means you actually need to take a stopwatch and calculate precisely everything that you do on that job because what you do on that job sets the stage for the next job the next job and every job thereafter because what you're doing is you're calculating data for yourself for your future estimates so you are legitimately going to take a stopwatch and you are going to click it and keep track of exactly how many man hours you did on that job you're going to calculate exactly how many hours you put on an excavator how many hours you put on a backhoe how many hours you put on your skid loader you're also going to calculate exactly how many hours your dump truck was on the job site you're going to calculate how many hours that it traveled going down the road how much fuel that truck burned you're going to keep track of how many dumps it took to remove it and then you're going to keep track of every single expense associated with that job because that one single job sets up the blueprint for how you're going to bid all of your future work when you start to calculate data on every single one of your jobs it tightens up your numbers for future projects the Beauty and the curse of what we do as contractors is no two jobs are ever alike but we can calculate data and use bits and pieces from past projects to help us figure out our future projects so when we look at a job like this we start to break down exactly how we do it and on a project like this we try to make it into bite-sized chunks how do you eat an elephant one bite at a time and I'm gonna teach you in just a moment how we break down a job into bite-sized chunks so we can take this monster elephant in the room and make it digestible and understandable so we break this down into bite-sized chunks and the first bite-sized chunk is removing clean just cleaning up the failed wall the second bite size trunk is replacing the re the wall that failed the third bite-sized chunk is backfilling compacting and putting the dirt back so now instead of having one big monstrous thing that we're trying to understand we've got three little components that we…