Lay First Course of Interlocking Blocks

4:41
11:23
24.5K views

At 4:41 in

Building a new retaining wall and sodding.

What happens here

Tools and materials

  • Interlocking Retaining Wall Blocks
  • Level
  • Rubber Mallet/Hammer
  • String Line
  • Gravel Base Material Unspecified

What they say

Hide

Now the easiest way to break down a bid is in phases. You can we do it but with demolition and excavation as phase one. That's tearing everything apart and prepping for the build. The build itself is phase two. whether that's a retaining wall, a paper patio, uh installing trees, or anything that is the new stuff that's going in place. And then phase three is the restoration. So that is putting everything back together with a nice like it's like buying a Christmas present, putting in a package, wrapping it up, and putting the bow on top of it with your card on the top of it. That's what the restoration does. Puts everything back in order. So, let's break this thing down a little [Music] further. Now, here's where it gets a little bit tricky. On phase one of every job, that's going to be different. You're never going to have the same retaining walls to write rip out, the same slopes to go down, the same amount of dirt to take out. that will always be different. But phase two on a retaining wall build will almost always be the

Auto-generated from the video audio.