Remove Excess Materials and Clean Up

16:21
21:58
8.4K views

At 16:21 in

Building a Failed Boulder Wall

What happens here

Once the new retaining wall is fully constructed, gather the old, smaller boulders that were removed during the excavation process. Use the heavy-duty crane truck (such as a Hood 7000 or similar) to pick up these old boulders from the staging area. The crane operator carefully loads the old rocks back into the truck bed for removal from the site. This step ensures that the job site is clean and all construction debris is properly disposed of or repurposed.

Goal: Clear the job site of all unused or discarded materials.

Tools and materials

  • Heavy-duty Crane Truck Hood 7000 — Loading old boulders onto the truck
  • Old Boulders N/A — Disposal or repurposing

What they say

Hide

To do this build the right way meant we needed to import larger stones and we

Auto-generated from the video audio.