Install Horizontal Wall Base
0:00
0:24
7.4K views
At 0:00 in
Build a deck, but make it *art*
What happens here
The first phase of constructing the decorative deck wall involves the installation of the horizontal base planks. These planks are systematically attached to the underlying structural frame of the wall. The worker uses a cordless drill/driver to secure each plank with deck screws, ensuring they are evenly spaced and aligned to form a consistent wooden backdrop. This creates the foundational layer against which the decorative elements will be mounted. A measuring tape and level are essential for accurate placement and straight lines.
Goal: Establish the primary horizontal background for the decorative wall.
Tools and materials
- Cordless Drill/Driver DeWalt — To drive deck screws and secure planks to the wall frame
- Horizontal Wall Planks — The main material for the wall's background, appearing to be composite decking or treated lumber
- Level — To ensure planks are installed perfectly horizontally and the wall is plumb
- Measuring Tape — For accurate plank placement and consistent spacing between planks
- Deck Screws — To fasten the planks to the structural wall frame