Commencing Concrete Wall Demolition
At 0:25 in
Big Jobs, Heavy Equipment & Bad choices- my worst beginner mistakes & what I've learned from them
What happens here
Following the preliminary debris removal, the excavator initiates the primary demolition of the concrete swimming pool structure. The operator skillfully uses the excavator's bucket to apply direct force and leverage against the concrete walls, causing large sections to crack and break apart. These substantial, broken pieces of concrete are then lifted by the excavator out of the pool basin and transported to a temporary collection area on the surrounding ground. This action effectively begins the physical dismantling of the pool's structural integrity, transforming the intact structure into manageable rubble.
Goal: The excavator proceeds to systematically break down the concrete walls of the swimming pool, dislodging and lifting large sections to begin the main demolition phase.
Tools and materials
- Excavator (Komatsu PC120-6)
- Excavator Digging Bucket
What they say
(615 characters)Hide
What they say
(615 characters)Auto-generated from the video audio.