Initial Soil Excavation and Disposal
0:00
0:33
6.3K views
At 0:00 in
backyard pool/patio getting excavated
What happens here
Begin the excavation process by using a skid-steer loader to remove the top layer of soil from the designated swimming pool area. Scoop large quantities of dirt with the loader's bucket and transport it to a waiting dumpster or roll-off container for immediate disposal. This initial phase clears the surface and begins to define the overall footprint of the pool.
Goal: Clear the surface and begin shaping the pool's footprint by removing topsoil.
Tools and materials
- Kubota Skid-Steer Loader Kubota — Excavating and moving large quantities of soil
- Roll-Off Dumpster — Containing and transporting excavated soil off-site