Demolish Pool & Compact Subgrade for Patio
At 5:56 in
BackYard Patio Landscape Design & Pool Removal in Edina Mn
What happens here
With soil delivery underway, the Bobcat 325 mini-excavator is driven directly into the empty swimming pool basin. The concrete (gunite) shell and any remaining steel wall panels of the pool are systematically broken up and removed. As these structures are extracted, fill dirt is placed into the pool cavity. The excavator operator performs preliminary 'compression compaction' by driving over and pressing the dirt to begin leveling and densifying the backfill. The narrator explicitly states that after this initial leveling, the 1000lb plate compactor will be brought into the pool area to 'plate pack this thing up' to ensure thorough compaction and prevent settlement in the future patio area.
Tools and materials
- 1000lb Plate Compactor (Wacker Neuson)
- Bobcat 325
- Bobcat S185 (Skid Steer)
- Fill Dirt
What they say
(1,576 characters)Hide
What they say
(1,576 characters)Auto-generated from the video audio.