Skip to main content

Lay Main Field Pavers

0:05
0:59
1.2K views

At 0:05 in

accent day #unilock #hardscape

What happens here

Once the base is prepared, begin laying the main field pavers. Start in a corner, typically against a fixed structure like the house, and work outwards. Place each paver gently onto the bedding sand, maintaining consistent joint spacing as specified by the paver manufacturer or desired aesthetic. Use a rubber mallet to tap each paver firmly into place, ensuring it is seated properly and level with its neighbors. Continuously check for levelness across multiple pavers with a long level. The video shows workers efficiently laying these large format pavers across the patio area (e.g., 0:05-0:06, 0:38-0:40).

Goal: Install the primary paver surface of the patio

Tools and materials

  • Gloves — Protecting hands from abrasions and dirt
  • Knee Pads — Protecting knees during prolonged kneeling while laying pavers
  • Level — Checking the levelness and grade of the laid pavers
  • Pavers — Forming the primary surface of the patio
  • Rubber Mallet — Tapping pavers into the sand bed for level seating