Absolutely way too tight of a roadway. Doing this any other way would have been slower. #hardscape

What happens here

Once the first skid steer has a full bucket of excavated material, carefully maneuver it to the edge of the water body, positioning it close to the second skid steer on the bank. The second skid steer should adjust its bucket to an optimal height and angle to receive the material. The operator of the first skid steer will then slowly and precisely elevate and extend its bucket, dumping the excavated material directly into the bucket of the second skid steer. This 'hand-off' requires precise coordination and clear communication between both operators to prevent spillage and ensure safety.

Goal: Safely and efficiently transfer excavated material between two skid steers.

Tools and materials

  • Skid Steer Loader — Receiving material from the first skid steer
  • Spotter — Overseeing the transfer and communicating with operators