Optimize Power Rake Settings
At 8:50 in
A new Grading bucket for a MIni loader
What happens here
Before beginning power rake operation, ensure the mini-loader is properly set up. Insert the key and start the engine. On the control panel, select the 'two-pump' option to ensure maximum power and hydraulic flow to the power rake drum. Even if high power isn't strictly needed for the task, maximizing the hydraulic flow by throttling the engine all the way up will make the power rake drum spin as fast as possible, leading to more efficient soil preparation. This might cause the engine to run 'a little bit high' but is necessary for optimal performance of the attachment.
Goal: Prepare the mini-loader for power rake operation by starting the engine, selecting the two-pump option, and throttling up to maximize drum spinning speed and hydraulic flow.
Tools and materials
- Key
- Mini-loader (CASTLOADERS 33T)
What they say
(1,603 characters)Hide
What they say
(1,603 characters)Auto-generated from the video audio.