Skip to main content

Mark and Excavate Drainage Trench

0:13
1:44
2.6K views

At 0:13 in

A little tiered patio walkway to ease the transition down to the pool deck?? Don't mind if I do!!

What happens here

Using a measuring tape, mark the exact location and width for the linear drainage trench. Carefully excavate a trench in the gravel bedding layer to the required depth and width using a hand shovel. Ensure the trench has a slight slope (grade) to allow for proper water flow towards a designated outlet. Use a screed tool, guided by concrete blocks placed along the edges, to level the bottom of the trench, preparing it for the drainage channels.

Goal: Create a precisely sized and graded trench for the drainage system.

Tools and materials

  • Concrete Blocks — Serving as guides to maintain the trench's width and depth during screeding
  • Hand Shovel — Excavating the gravel bedding to create the trench
  • Level — Verifying the grade and levelness of the trench bottom
  • Measuring Tape — Accurately marking the dimensions of the trench
  • Screed Tool — Leveling and compacting the bottom of the trench
  • Marking Chalk/Paint — Marking the trench outline on the gravel