Importing and Spreading Fill Material
At 7:38 in
A homeowners Nightmare
What happens here
A dump trailer is shown delivering dark, rich soil, which serves as the clean fill material. The fill is carefully unloaded onto the street or designated staging area. The compact track loader then transports this soil into the former pool cavity. The operator ensures that the fill is spread evenly across the bottom and sides of the pool, starting the critical process of rebuilding the ground level. This material will later be compacted in layers to create a stable foundation.
Goal: Clean fill material, typically soil, is brought to the site via a dump trailer and carefully unloaded. This material is then systematically spread into the excavated pool cavity to begin the backfilling process.