What happens here

After achieving the correct consistency, the mixed concrete is discharged from the 'Mud Mixer' directly into prepared forms on the ground. Multiple workers are involved: one continues to load bags into the mixer, another operates the mixer and directs the flow, and others use tools like rakes and screeds to evenly spread and level the wet concrete within the forms. The narrator notes that 30 bags of concrete were poured in approximately 20 minutes, with the mixer performing the majority of the labor-intensive work.

Goal: Fill and level the concrete forms for the pads.

Tools and materials

  • Concrete Forms — Shaping the concrete pads
  • Portable Concrete Mixer Mud Mixer — Dispensing mixed concrete
  • Rake — Spreading wet concrete
  • Screed Board — Leveling the concrete surface
  • Shovel — Assisting with spreading or moving concrete
  • Mixed Concrete — Filling the forms to create pads

What they say

Hide

top of it allowing you to adjust the flow of water going into the mix. So, if you need it thicker or thinner, just turn that dial and you'll get it right to where you want it. It took us about 20 minutes to pour those 30 bags of concrete with the mud mixer doing most of the heavy work for us. Now, it has a set of wheels allowing it to be moved in and out of tight job sites. But if that isn't good enough, you can pull a pin and the entire top of the machine will