Skip to main content

Integrate Old Deck with New Framing

13:29
22:23
309.2K views

At 13:29 in

3 day DIY- NO Dig Deck day 1 of 2

What happens here

Address any existing deck boards that are bowed or uneven before installing new decking. The video demonstrates face-screwing a 2x4 onto the existing bowed deck structure and notching it to accept a new deck joist. This helps to straighten and integrate the old section with the new, ensuring a flush and level transition. A hammer and chisel are used to refine the notches for a perfect fit.

Goal: Ensure a flush and stable transition between old and new deck sections

Tools and materials

  • 2x4 Lumber — Reinforcing and leveling bowed sections of the old deck
  • Chisel — Refining notches for a perfect fit
  • Circular Saw Skil — Making cuts for the notches
  • Hammer — Chipping out wood for precise notches

What they say

Hide

we're adding on to the old deck as you can see but we've got leg bolts we're gonna notch around them [Music] [Applause] oh fit all right let's see uh i'll take this end out here about the same distance the way it looks yeah it kind of does doesn't it

Auto-generated from the video audio.