Skip to main content

Install Concrete Block Bases and 4x4 Posts

1:52
22:23
309.2K views

At 1:52 in

3 day DIY- NO Dig Deck day 1 of 2

What happens here

Dig shallow holes for the concrete blocks that will support the deck posts. The soil in this area is sandy, which is ideal for a floating deck as it resists frost heave. The existing sill plate is temporarily raised and leveled using a railroad jack. Once the sill plate is level, install the concrete block bases in the excavated areas. The posts will rest on these bases, which have a notch cut into them to allow for water drainage. The deck is not physically attached to the house to avoid frost footing requirements of building codes, allowing it to 'float' next to the house.

Goal: Create stable, level foundations for the deck posts without deep footings

Tools and materials

  • 4x4 Pressure-Treated Posts — Vertical supports for the deck structure
  • Circular Saw SKIL PWRCORE 20 — Cutting the 4x4 posts to length and starting the notches
  • Concrete Block Bases — Providing stable foundations for the 4x4 posts
  • Level Milwaukee — Ensuring the sill plate is perfectly level
  • Pencil — Marking cut lines on posts
  • Railroad Jack — Lifting and leveling the sill plate (ledger board)
  • Reciprocating Saw SKIL PWRCORE 20 — Finishing the notches in the 4x4 posts
  • Shovel — Digging shallow holes for the concrete blocks
  • Tape Measure — Measuring post lengths and notch positions

What they say

Hide

frankie and i divide and conquer he starts prepping to put in the post while i'm hanging the joist hangers so frankie's leveled the sill plate out using the railroad jack to lift it up yep then he'll dig down get his post in and measure down to actually insert the post right take the top surface off because the rest of it should be compacted from the rain and stuff that comes off the roof up here it's sand oh yeah we're good the new deck framing is not actually tied to the house this deck will sit next to the house but not be physically connected to it as soon as we connect the deck to the house then we've opened up a whole new code of books a whole new book of codes and that includes frost footings which we want to avoid in this case just to make it faster six feet on center for post frankie yeah we're gonna put this up i don't want to put this in there for a temporary then i'm gonna hang my front beam okay runner level i can run this you can go a little higher than level right there now the old deck has had time to settle and adjust in the new deck needs some time to do the same thing so we're going to make it just a titch higher and allow the two decks to settle together and then go back months later and adjust them so that they're perfectly level after everything is adjusted down [Applause] everything will get double framed and secured with three inch deck screws see why why i don't hang why i don't put joyce hangers on the outside is let me tell you on the camera is because we face screw it and then i double plate it a double plate goes on last so everything's face screwed three with three screws each so here we can't get behind to face screw it right so then i went with joyce hangers then i usually do against the house anyways i put the joist hangers so you like face screwing better than joyce hangers well i i think it's just maybe i think it's just a song but okay it all kind of code will tell you to do both sides but i think it's a waste of time okay the permanent pulse go in before the rest of the framing begins the soil in this area is pure sand making it perfect for a floating deck we only have to strip the top organic layer off to get down to good soil this concrete block has been specifically designed to hold the post in place without allowing it to slip or move out but frankie has cut a notch in it to allow the water that could potentially get in there to drain out now if we attach this deck to the house we would technically have to put in a…

Auto-generated from the video audio.