Site Visit 5: Winter Excavation Planning
At 13:28 in
2 days at work, 6 landscape Construction sites, 1 big problem plus an Abandoned House? vlog #0003
What happens here
At the fifth job site, the client plans a basement addition excavation in January/February, a period of 'insanely cold' weather in Minnesota. The landscaper outlines the significant challenges and costs associated with winter excavation, including 'frost charges' (hourly rates for breaking frozen ground) and the necessity of using ground-thawing blankets. He advises the client to seriously reconsider and wait for warmer weather in spring to avoid thousands of dollars in extra costs and logistical difficulties, emphasizing that summer jobs are always subject to changes and winter work magnifies those complexities by eightfold.
Goal: Understand the complexities and cost implications of winter excavation for a basement addition.
Tools and materials
- Heavy Machinery — Breaking ground, digging, and hauling soil
- Ground-Thawing Blankets — Thawing frozen ground for excavation
- Hay — Insulating the ground against frost