Skip to main content

Site Preparation

0:04
18:31
6.9K views

At 0:04 in

1 Day She Shed

What happens here

Before the shed components arrive, the selected location needs to be thoroughly prepared. This involves using heavy machinery, specifically a Kubota SVL 97-2 compact track loader, to remove any dead or unwanted trees from the area where the shed will be placed. Following tree removal, the ground must be leveled with precision. The goal is to achieve a flat pad within a tolerance of plus or minus 6 inches across the entire footprint of the shed. This precise leveling is crucial for the structural integrity and ease of assembly of the pre-fabricated shed.

Goal: The initial step involves clearing the chosen site of any obstacles, such as dead trees, and then meticulously leveling the ground to create a stable and even foundation for the pre-fabricated shed. This ensures proper installation and long-term stability.

Tools and materials

  • Kubota SVL 97-2 Compact Track Loader
  • Laser Level (Milwaukee brand shown)
  • Long Stick/Rod

What they say

Hide

light now I just ordered a building online off from a website and they claim that they're going to come out to my site deliver the building fabricate it right there install it and paint it in one day the only thing that I have to do is get the ground prepped and ready within a tolerance of plus or minus 6 in

Auto-generated from the video audio.