Skip to main content

Build and Install Railing Posts — Build and Install Railings

Intermediate4 mins

Part of project

Deck Construction · Step 10 of 13

Helpful?

In this video

Begin by preparing the posts for the railings. Railing construction is subject to strict building codes, particularly concerning height, attachment methods, and baluster spacing. Always confirm these requirements with your local inspector. To create a clean look, cut a decorative notch into the railing posts where the horizontal rails will sit. Use a circular saw with the blade set to 1.5 inches deep to make several parallel relief cuts within the notch area. Break out the waste wood with a hammer, then clean and refine the notch using a chisel and a block plane for a smooth finish. Once notches are complete and posts are cut to the required height (with a 45-degree bevel on top for aesthetics), lay out their positions along the deck perimeter, ensuring they meet minimum spacing codes. Drill pilot holes for carriage bolts, checking that each post is plumb and square before drilling the second hole. Insert carriage bolts, with washers and nuts, and tighten them down with a wrench to secure the posts.

7.5M views91.8K

FAQs

How difficult is building a deck, and how much time should I realistically expect it to take?

Building a deck is an intermediate to advanced DIY project that requires careful planning and precision. While individual tasks vary, a complete deck build can easily take several weekends or even weeks, depending on the size, complexity, and your experience level. Don't underestimate the time needed for planning, permits, and inspections.

Why are permits and local building codes so important for deck construction?

Permits ensure your deck meets safety standards and local building regulations, preventing potential fines and ensuring structural integrity. Local codes dictate crucial aspects like footing depth, span lengths for beams and joists, fastener types, and railing height. Always check with your local municipality before starting any work to avoid costly rework or safety hazards.

What specialized tools will I need beyond basic hand tools for building a deck?

Beyond common tools like a measuring tape, pencil, and level, you'll need specialized equipment such as a post hole digger for footings and a power saw for cutting lumber accurately. A decking tool, like the Plank Rite Decking Tool mentioned, can be very helpful for consistent board spacing. Consider renting larger tools for efficiency.

What are some common mistakes beginners make that compromise deck safety and longevity?

A major mistake is neglecting proper footing depth and size, which can lead to settling and instability. Another common error is improperly attaching the ledger board to the house or failing to use appropriate fasteners, which can cause catastrophic structural failure. Always ensure all connections meet local code requirements and are securely fastened to carry the intended load.