Skip to main content
Under Stair Storage

Under Stair Storage

Expert
4 minutes
7 Steps
33 Items

About This Project

This project involves designing and building custom drawers or pull-out carts to maximize storage space within the often-underutilized area beneath a staircase. The process includes measuring the space, designing the storage units, selecting appropriate materials, cutting and assembling the components, and installing them into the stair cavity.

J

Based on content from

John Heisz - I Build It
1.2M subscribers· +9 others
View Channel

Tools & Materials

FASTCAP 16 ft. Metric/Standard Flat Back Measure Tape FC.PMS.F16

FASTCAP 16 ft. Metric/Standard Flat Back Measure Tape FC.PMS.F16

OX TOOLS OX Tuff Carbon - Marking Pencil Value Pack OX-P503210

OX TOOLS OX Tuff Carbon - Marking Pencil Value Pack OX-P503210

TOUGHBUILT Small Grid Notebooks with 100-sheets, heavy-gauge steel binding and rugged cover, black (3-Pack) TB-56-S-3

TOUGHBUILT Small Grid Notebooks with 100-sheets, heavy-gauge steel binding and rugged cover, black (3-Pack) TB-56-S-3

Designer Stencils Vertical Scroll Wall Stencil 3386

Designer Stencils Vertical Scroll Wall Stencil 3386

Pencil

Pencil

Ornamental Mouldings 1262 3/4 in. x  5 1/2 in. x  96 in. Primed Baseboard Moulding (1-Piece − 0.67 Total Linear Feet) 1262-8FTPRIM

Ornamental Mouldings 1262 3/4 in. x 5 1/2 in. x 96 in. Primed Baseboard Moulding (1-Piece − 0.67 Total Linear Feet) 1262-8FTPRIM

Steps

Frequently Asked Questions

The project summary lists an estimated time of 4 minutes, but it seems more complex. How long should I realistically expect this project to take?

The 4-minute estimate is likely a typo. Given the design, cutting of plywood, assembly of units, and installation, this intermediate project typically requires several hours to a full weekend, depending on your experience and the complexity of your design. Plan for at least 8-16 hours of work spread across multiple sessions.

Always wear safety glasses when operating cutting tools to protect your eyes from flying debris. Use gloves to prevent splinters, and ensure your work area is well-ventilated if using adhesives or finishes. When installing, securely anchor the units to the studs or solid framing to prevent tipping.

For durability and a good finish, 3/4 inch birch plywood, as listed in the materials, is an excellent choice. You'll need to precisely measure your under-stair cavity to calculate the exact amount of plywood, drawer slides, and caster wheels required. Expect material costs to vary, but budget a few hundred dollars depending on hardware quality and wood choice.

Start by measuring the height, width, and depth of your stair cavity at multiple points, as walls are rarely perfectly square. Account for the stair's slope by creating a template from cardboard before cutting your final materials, ensuring your units will slide in and out smoothly without catching.

A frequent mistake is inaccurate measurements, leading to units that don't fit or operate smoothly. Double-check all measurements before cutting and create a detailed cutting plan. If drawers stick, check if slides are level and plumb, and ensure there's enough clearance around the units.

Yes, for a different look or budget, you could consider solid pine boards for a rustic feel or MDF for painting, though MDF is less durable. Instead of traditional drawer slides, you could build simpler pull-out bins directly on caster wheels, or opt for fixed shelving if full drawer access isn't a priority.

These items are for aesthetic enhancements. Designer Stencils could be used to add decorative patterns to the drawer faces or the inside of the units. The Primed Baseboard Moulding would likely be used to trim out the exterior opening of the under-stair cavity, giving the installed units a more finished, built-in appearance.